The facility has an annual throughput capacity of 550,000 tons of frac sand with 3 rail tracks capable of holding 60 cars for unloading. We receive delivery from CN 6 days per week to ensure that product is always available.

Features of the new terminal include:

  • ​11,000 Tons of storage capacity
  • 4 x 2,750 Ton silos
  • 1 x 100 Ton day silo
  • 3 spur rail siding
  • 60 railcar capacity
  • 6 switches per week from CN (20 railcars per switch)
  • loading times of less than 10 minutes
  • scaled loading
  • railcar mover
  • ability to weigh product from railcar
  • 350 Ton/hour bucket elevator
  • dustless system
  • track mounting – walkways above truck to access hatches
  • no demurrage
  • 24 hour operation

Address: #45, 61027 Hwy 672 Emerson Trail Industrial Park, Grande Prairie, AB, T0h 3C0

Phone: 780.568.2096

Email: gpsand@di-corp.com

You might also like

Learn More About Our Drilling Equipment
& Supplies