Are you spending a significant amount of time and money on solidification products for your wet spoils? So was West End Connectors JV when they were working on a tunnelling/ micro tunnelling project that produced an overwhelming stream of wet spoils. The solidification product they were using required a very high dosage rate that significantly added to the treatment cost.
Then, West End Connectors JV made the switch to Mud Terminator which provided better solidification with half the amount of product, resulting in significant time savings.
If you’ve experienced similar issues with solidifying wet spoils, downloading this case study will help you learn:
- The consequences of untreated wet spoils.
- How you can cut solidification product usage and experience fewer traffic disruptions.
- How much bulk Mud Terminator adds to wet spoils compared to the alternatives.