Case Study
Download case study

How Earth Pro Mud Terminator Helped Reduce Stormwater Pond Maintenance Costs, Site Footprint & Environmental Impact

The Toronto Region Conservation Authority (TRCA) must regularly dredge storm water management ponds when they reach their limit of sediment. To do so, they needed to reduce the environmental impact of removing wet dredged sediment and eliminate spillage of wet material in residential areas.

Di-Corp had the solution to solidify the material using Earth Pro Mud Terminator onsite prior to transport.

If you’ve experienced similar issues with site clean up, downloading this case study will help you learn: 

  • Reduce required trucking by increasing capacity.
  • Lowered greenhouse emissions.
  • Reduced need to stock pile on site.

Working with municipalities and other partners to look after the watersheds of the Toronto region and its Lake Ontario waterfront, [TRCA] help people understand, enjoy and look after the natural environment.

-