The Toronto Region Conservation Authority (TRCA) must regularly dredge storm water management ponds when they reach their limit of sediment. To do so, they needed to reduce the environmental impact of removing wet dredged sediment and eliminate spillage of wet material in residential areas.
Di-Corp had the solution to solidify the material using Earth Pro Mud Terminator onsite prior to transport.
If you’ve experienced similar issues with site clean up, downloading this case study will help you learn:
- Reduce required trucking by increasing capacity.
- Lowered greenhouse emissions.
- Reduced need to stock pile on site.