Case Study Download Mud Terminator MetroLinx

From Slurry to Soil in Minutes

Faster acting Mud Terminator, applied at half the rate of other solidification products, provided equal or better solidification of wet spoils at the massive Metrolinx Eglinton Crosstown Subway Tunnel project in Toronto, Canada. Treated soil could be stacked dry onsite and removed during the night shift, leading to fewer traffic disruptions plus lower trucking and disposal costs.